Interior Of The Detroit River Tunnel, Detroit, Mich.

Interior Of The Detroit River Tunnel, Detroit, Mich.
Year: 
1914
Publisher: 
G. T. Photochrom
Type(s): 
Postcard
Identifier(s): 
A-17409
Language: 
English
Source: 
Mike Skreptak; Black Binder 4
Notes: 
Postmarked 1914; "The Detroit Tunnel was built for the M. C. R. R. at the cost of $8,500,000. It is 1 3/8 miles in length. Construction was started in July 1906 and completed July 1, 1910. Electricity, the third rail system, furnishes the motive power for the engines"; addressed to Mr. Jack Madden of Dresden, Ont.
Subject(s): 
Detroit River Tunnel Company
Michigan Central Railway Tunnel (Windsor Detroit)
Tunnels
Railways
Place(s): 
Windsor (Ontario)
Detroit (Michigan)
Rights: 
Public Domain
Repository: 
University of Windsor. Leddy Library
Tiff Image(s):
Click links to download Tiff images: Tiff Image 1 , Tiff Image 2